Loading recruiting intelligence
Loading recruiting intelligence
Other
Anduril
Likely around
Sep 17, 2027
Window Jul 20 – Nov 15, 2027
History
Seen open by Feb 15, 2024
ArchiveSource
No trustworthy earlier capture establishes absence before this appearance.
Seen open by Feb 3, 2021
ArchiveSource
No trustworthy earlier capture establishes absence before this appearance.
Prep plan
Save this program to your watchlist and 1stSeen works back from its likely date: when to start networking, and when your résumé should be ready. Saving needs a free account. Create an account
Ask about this program
1stSeen looks again at the postings, the past openings, and any recruiting news for this program, and lists each step as it goes.
Forecasted Sep 19, 2026, 19:42 UTC.
Each factor runs from 0 to 1. Signals against and signal conflict lower the score; every other factor raises it. Sparse recruiting history is capped: 3 recruiting cycles behind this window. The score measures how much consistent evidence backs the window, not the chance that it is right.
Every row is a record the model read, with the page it came from and how much it counted.
| Contribution | Observations | Weight |
|---|---|---|
| An opening of this programDirect role opening weighted by source quality, recency, and date uncertainty. | 3 | 100.0% |
Every contribution, with the record it was read from.
95.4%
of the model's weight
Sep 19, 2026, 19:23 UTC
2.8%
of the model's weight
Sep 19, 2026, 16:43 UTC
1.8%
of the model's weight
Sep 19, 2026, 16:43 UTC
2027 Early Career Industrial Engineer
Published Sep 15, 2026 · last seen Sep 19, 2026
Open postingJul 20, 2027 – Nov 15, 2027
expected Sep 17, 2027
34 / 100
current