Loading
Loading
Historical model audit
Return to a historical cutoff and reconstruct what 1stSeen could have predicted, using only the evidence it held by then. Every run is computed by the worker’s leak-safe backtest when you ask for it.
Future evidence is sealed
The held-out opening and every post-cutoff observation are scoring data only. They cannot enter the forecasting component.
What can be replayed
An archive capture proves a role was visible by then, not that it opened then, so an observed-by opening is never scored as ground truth.
Latest backtest
Finished Oct 3, 2026 · cutoff 60 days before each target · 890 targets, 0 scored, 890 skipped
Counted over every reconstructed cycle the backtest evaluated, which is more than the replay candidates above. Reasons are the backtest’s own words.
Showing 81–100 of 153
Rocket Lab
Launch Safety Software Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Varda Space
Flight Software Intern Spring
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Varda Space
Guidance Navigation Controls Gnc Intern Spring
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Varda Space
Site Reliability Intern Spring
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
DRW
Quantitative Trading Analyst
Latest backtest held out another posting of this role that year
Flow Traders
Trading Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Belvedere Trading
Quantitative Trading Intern Summer
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Belvedere Trading
Quantitative Trader Entry Level
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Rocket Lab
Ground Systems Engineering Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Rocket Lab
Supplier Quality Engineer Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
IMC
Graduate Software Engineer Start Date in
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
IMC
Hardware Engineer Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
IMC
Quantitative Trader Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
IMC
Graduate Trader
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
IMC
Graduate Quantitative Researcher
Not in the latest backtest run
Flow Traders
Graduate Quantitative Trader
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
PDT Partners
Summer Systems Engineering Intern
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Verkada
Embedded Software Engineer Access Control
Skipped in the latest backtest
no temporal evidence was available by the forecast cutoff
Optiver
Quantitative Trading Intern Taiwan
Not in the latest backtest run
Virtu Financial
Intern Software Engineer
Not in the latest backtest run
Rocket Lab · Launch Safety Software Intern · held out Aug 7, 2026 exact